Saturday, September 13, 2008. The day the tower was raised.
========================================================
The tower is ready for lifting into position, scheduled for Saturday, September 13, 2008
The
tower sections are put together 08/15/08
The
tower base and concrete is complete 08/09/08
N8MDP
John hard at work pouring concrete 08/09/08
First
pouring of concrete on 08/09/08.
Concrete delivered. Ready for pouring on 08/09/08.
Hole with Tower added for position 08/03/08
Hole with ReBars added 08/03/08
First checkout of the base in the hole 7/29/08
Me
in the hole! 07/19/08
The results of the first digging 07/18/08
The broom handle marks the spot! 06/29/08